₹12.3 Cr
Approx. project cost
9–12
Acres of land
49.9L
Units / year
6.9–10.5 yr
Payback
Who a 3 MW plant is for

A 3 MW plant suits investors deploying ₹10+ crore and mid-sized developers building a DREBP portfolio.

Built under DREBP or open access.

3 MW at a glance

₹12.3 Cr
Total project cost
9–12 acres
Land required
49.9L
Units / year
6.9–10.5 yrs
Payback

The economics of a 3 MW plant, in plain words

Over its 25-year life a 3 MW plant in Gujarat generates about 49.9 lakh units a year. Under a DREBP PPA at ₹2.76/unit that is roughly ₹1.38 crore of revenue a year; on open access nearer ₹2 crore. After ₹0.21 crore of annual O&M, net income runs ₹1.17–1.79 crore a year, so the ₹12.3 crore build pays back in about 6.9–10.5 years and then earns largely profit. Claiming 40% accelerated depreciation shields roughly ₹1.23 crore of tax in year one, and undiscounted 25-year PPA revenue is around ₹34.5 crore.

3 MW cost & return breakdown

Sourced figures — not an EPC quote.

Parameter3 MWvalue (indicative)
Total project cost (CAPEX)₹12.3 Cr
Land required9–12 acres
Annual generation49.9 lakh units/yr
Annual revenue (DREBP PPA)₹1.38 Cr/yr
Annual revenue (open access)₹2 Cr/yr
Annual O&M cost₹0.21 Cr/yr
Net annual income₹1.17 – 1.79 Cr/yr
Payback period6.9 – 10.5 yrs
Year-1 AD tax benefit (40%)₹1.23 Cr
25-year gross revenue (PPA)₹34.5 Cr

Assumptions: 19% CUF, ground-mount EPC cost, Gujarat irradiance. Actual figures vary by site.

Key considerations for a DREBP-scale plant

At 3 MW you are at the DREBP sweet spot — up to the 5 MW scheme ceiling, on a fixed 25-year PPA with the discom at a known tariff. It needs about 9–12 acres near a single 66 kV substation with evacuation headroom. The whole return hinges on that land-to-substation fit, so site selection and the DREBP registration matter more than shaving the EPC price.

~9–12 acres by a 66 kV substation
DREBP fixed 25-year PPA (≤5 MW)
Substation headroom decides feasibility
Clean title + DREBP registration first

An estimate isn’t a quote.

For your 3 MW project, we tender it across our EPC network and negotiate your best real price — with the hidden costs exposed.

Frequently Asked Questions

A 3 MW ground-mount solar plant in Gujarat costs roughly ₹12.3 crore turnkey — modules, inverters, structures, civil works and grid connection. DCR-module projects cost ~₹0.8–1.0 crore/MW more.

Get an exact quote for your 3 MW plant

We tender it across our EPC network and negotiate your best price.