Solar Plant Cost & ROI

10 MW solar power plant cost in Gujarat

A complete, independent cost, land, generation and return breakdown for a 10 MW ground-mount solar plant in Gujarat.

Open ROI calculator
₹38 Cr
Approx. project cost
30–40
Acres of land
166.4L
Units / year
6.4–9.8 yr
Payback
Who a 10 MW plant is for

A 10 MW plant is true utility-scale — for IPPs, corporates and funds, usually via open access or third-party PPA rather than DREBP.

Built via open access, group captive or third-party PPA.

10 MW at a glance

₹38 Cr
Total project cost
30–40 acres
Land required
166.4L
Units / year
6.4–9.8 yrs
Payback

The economics of a 10 MW plant, in plain words

Over its 25-year life a 10 MW plant in Gujarat generates about 166.4 lakh units a year. Under a DREBP PPA at ₹2.76/unit that is roughly ₹4.59 crore of revenue a year; on open access nearer ₹6.66 crore. After ₹0.7 crore of annual O&M, net income runs ₹3.89–5.96 crore a year, so the ₹38 crore build pays back in about 6.4–9.8 years and then earns largely profit. Claiming 40% accelerated depreciation shields roughly ₹3.8 crore of tax in year one, and undiscounted 25-year PPA revenue is around ₹114.75 crore.

10 MW cost & return breakdown

Sourced figures — not an EPC quote.

Parameter10 MWvalue (indicative)
Total project cost (CAPEX)₹38 Cr
Land required30–40 acres
Annual generation166.4 lakh units/yr
Annual revenue (DREBP PPA)₹4.59 Cr/yr
Annual revenue (open access)₹6.66 Cr/yr
Annual O&M cost₹0.7 Cr/yr
Net annual income₹3.89 – 5.96 Cr/yr
Payback period6.4 – 9.8 yrs
Year-1 AD tax benefit (40%)₹3.8 Cr
25-year gross revenue (PPA)₹114.75 Cr

Assumptions: 19% CUF, ground-mount EPC cost, Gujarat irradiance. Actual figures vary by site.

Key considerations at utility scale

Above 5 MW you are past the DREBP ceiling, so a 10 MW plant sells through open access, group captive or a competitively bid PPA instead of a fixed scheme tariff. It needs 30–40 acres of aggregated land, 66 kV or higher evacuation, and a firm offtake. Wheeling and banking charges, connectivity approvals and the PPA counterparty's credit drive the real return far more than headline EPC price.

30–40 acres aggregated with clear titles
66 kV+ evacuation and connectivity approval
Open access, group captive or bid PPA
Wheeling/banking charges shape the real return

An estimate isn’t a quote.

For your 10 MW project, we tender it across our EPC network and negotiate your best real price — with the hidden costs exposed.

Frequently Asked Questions

A 10 MW ground-mount solar plant in Gujarat costs roughly ₹38 crore turnkey — modules, inverters, structures, civil works and grid connection. DCR-module projects cost ~₹0.8–1.0 crore/MW more.

Get an exact quote for your 10 MW plant

We tender it across our EPC network and negotiate your best price.