GujaratSolar Advisory
Solar Plant Cost & ROI

2 MW solar power plant cost in Gujarat

A complete, independent cost, land, generation and return breakdown for a 2 MW ground-mount solar plant in Gujarat.

Open ROI calculator
₹8.2 Cr
Approx. project cost
6–8
Acres of land
33.3L
Units / year
6.9–10.5 yr
Payback
Who a 2 MW plant is for

A 2 MW plant is the maximum size under PM-KUSUM Component-A and a popular DREBP ticket for HNI investors.

The sweet spot for PM-KUSUM Component-A and DREBP.

2 MW at a glance

₹8.2 Cr
Total project cost
6–8 acres
Land required
33.3L
Units / year
6.9–10.5 yrs
Payback

The economics of a 2 MW plant, in plain words

Over its 25-year life a 2 MW plant in Gujarat generates about 33.3 lakh units a year. Under a DREBP PPA at ₹2.76/unit that is roughly ₹0.92 crore of revenue a year; on open access nearer ₹1.33 crore. After ₹0.14 crore of annual O&M, net income runs ₹0.78–1.19 crore a year, so the ₹8.2 crore build pays back in about 6.9–10.5 years and then earns largely profit. Claiming 40% accelerated depreciation shields roughly ₹0.82 crore of tax in year one, and undiscounted 25-year PPA revenue is around ₹23 crore.

2 MW cost & return breakdown

Sourced figures — not an EPC quote.

Parameter2 MWvalue (indicative)
Total project cost (CAPEX)₹8.2 Cr
Land required6–8 acres
Annual generation33.3 lakh units/yr
Annual revenue (DREBP PPA)₹0.92 Cr/yr
Annual revenue (open access)₹1.33 Cr/yr
Annual O&M cost₹0.14 Cr/yr
Net annual income₹0.78 – 1.19 Cr/yr
Payback period6.9 – 10.5 yrs
Year-1 AD tax benefit (40%)₹0.82 Cr
25-year gross revenue (PPA)₹23 Cr

Assumptions: 19% CUF, ground-mount EPC cost, Gujarat irradiance. Actual figures vary by site.

Key considerations for a plant this size

A 2 MW ground-mount plant needs roughly 6–8 acres near a viable substation and is usually funded with 25–30% equity and the rest as project debt. Most owners at this size go the DREBP route for a fixed 25-year PPA, or run captive to offset an industrial load. A bankable DPR and a clean land title are what decide financing.

~6–8 acres near a 66 kV substation
DREBP fixed-tariff PPA or captive use
Bankable DPR unlocks project debt
Clean title + evacuation approval are critical

An estimate isn’t a quote.

For your 2 MW project, we tender it across our EPC network and negotiate your best real price — with the hidden costs exposed.

Frequently Asked Questions

A 2 MW ground-mount solar plant in Gujarat costs roughly ₹8.2 crore turnkey — modules, inverters, structures, civil works and grid connection. DCR-module projects cost ~₹0.8–1.0 crore/MW more.

Get an exact quote for your 2 MW plant

We tender it across our EPC network and negotiate your best price.