₹0.46 Cr
Approx. project cost
0.3–0.4
Acres of land
1.7L
Units / year
7.7–11.5 yr
Payback
Who a 100 kW plant is for

A 100 kW system suits a factory rooftop, a school, a hospital or a small commercial building looking to cut its electricity bill rather than sell power.

Best as a rooftop captive system under net metering / the Gujarat Solar Policy.

100 kW at a glance

₹0.46 Cr
Total project cost
0.3–0.4 acres
Land required
1.7L
Units / year
7.7–11.5 yrs
Payback

The economics of a 100 kW plant, in plain words

Over its 25-year life a 100 kW plant in Gujarat generates about 1.7 lakh units a year. Under a DREBP PPA at ₹2.76/unit that is roughly ₹0.05 crore of revenue a year; on open access nearer ₹0.07 crore. After ₹0.01 crore of annual O&M, net income runs ₹0.04–0.06 crore a year, so the ₹0.46 crore build pays back in about 7.7–11.5 years and then earns largely profit. Claiming 40% accelerated depreciation shields roughly ₹0.05 crore of tax in year one, and undiscounted 25-year PPA revenue is around ₹1.25 crore.

100 kW cost & return breakdown

Sourced figures — not an EPC quote.

Parameter100 kWvalue (indicative)
Total project cost (CAPEX)₹0.46 Cr
Land required0.3–0.4 acres
Annual generation1.7 lakh units/yr
Annual revenue (DREBP PPA)₹0.05 Cr/yr
Annual revenue (open access)₹0.07 Cr/yr
Annual O&M cost₹0.01 Cr/yr
Net annual income₹0.04 – 0.06 Cr/yr
Payback period7.7 – 11.5 yrs
Year-1 AD tax benefit (40%)₹0.05 Cr
25-year gross revenue (PPA)₹1.25 Cr

Assumptions: 19% CUF, ground-mount EPC cost, Gujarat irradiance. Actual figures vary by site.

Key considerations for a rooftop system this size

At 100 kW the goal is self-consumption, not selling power. It sits on your own roof, needs no land, and offsets the most expensive slab of your electricity bill. Sizing follows your sanctioned load and daytime usage, and the connection runs through DISCOM net metering.

No land — mounts on existing roof or shed
Net metering under the Gujarat Solar Policy
Size to sanctioned load and daytime demand
Fastest payback via avoided grid tariff

An estimate isn’t a quote.

For your 100 kW project, we tender it across our EPC network and negotiate your best real price — with the hidden costs exposed.

Frequently Asked Questions

A 100 kW ground-mount solar plant in Gujarat costs roughly ₹0.46 crore turnkey — modules, inverters, structures, civil works and grid connection. DCR-module projects cost ~₹0.8–1.0 crore/MW more.

Get an exact quote for your 100 kW plant

We tender it across our EPC network and negotiate your best price.